tbee1704 tbee1704
  • 03-01-2020
  • Social Studies
contestada

What test items are determined by the Program Management Office that is developing the system?

Respuesta :

nalleitenw
nalleitenw nalleitenw
  • 03-01-2020

The correct answer is Critical Technical Parameters (CTPs)

Explanation: They are developed and coordinated by: The Independent Operational Test Agency.

Answer Link

Otras preguntas

Unit 9 Quiz 162611 (Form A) Question 164322 - Objective(s) 9.8.1 Read this sentence. Claudia is a person who rides a bike to work every day so that she can stay
Producers of vital registration​
In what two ways did Northerners respond to the Emancipation Proclamation?
find the value of the trigonometric ratio. make sure to simplify the fraction if needed.
4 glue sticks cost $7.76. Which equation would help determine the cost of 13 glue sticks?
Tobacco farming was labor-intensive, so the Virginia colony's economy developed a need for African slaves. True or false
An architectural drawing lists the scale as 1/4" = 1'. If a bedroom measures 3 1/2" by 5 1/4" on the drawing, how large is the bedroom? A. 20 ft by 30 ft B. 7ft
Describe the similarities and differences between the cheek cell wet mount and dental plaque wet mount.
how to use video tape approach in the classroom​
Question on verbs in French