raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

Multiply. Write your answer in simplest form. 5/7 x 7/10
For two functions, m(x) and p(x), a statement is made that m(x) = p(x) at x = 7. What is definitely true about x = 7? (2 points)
which organic compounds are often used to create fragrances for the perfume industry
Which sentence contains a verb in the passive voice? A. We caught a large trout in the river and ate it for dinner. B. The Snake River flows through the Grand
Multiply. Write your answer in simplest form. 2 1/2 x 3 2/3
Which decimal number is equivalent to 9/1000? 0.009 0.18 0.9 0.0009
what information is needed to create a monthly budget
Evaluate. [42 ÷ (2 + 3 • 2)] + [4 • (36 – 52)] I really need help!!!
Type the three adverbs separated by commas. Hastily, Isaac skimmed the very interesting article about fishing successfully.
During the Antebellum period, the slave relocation movement was a huge success. Freedmen were happy to leave America for a fresh start.