medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

a fixed antenna that is used to boost a radio signal is called the:repeater transfer radio receiver base station ​
How did enslaved and free African Americans preserve their cultural heritage in the face of discrimination?
Sali, one of the __________ students in the class, came up with __________ solution to the problem the instructor assigned. Select one: a. brightest; the most
Solve the inequality 3(x - 7) + 2(4x + 9) > 0.
when did the cholera epidemic started
Dr.Patterson just started an experiment .she will collect data for 8 days .How many hours is this​
A librarian has 883 books to place on shelves. Each shelf holds 98 books. How many books will be left over after filling as many shelves as possible?
A pair of congruent angles are described as follows: The degree measure of one angle is three more than twice a number, and the other angle’s degree measure is
what is shifting agriculture?by which name is it known in india​
y - 15 =-27 One step equation