kelvinkibalama kelvinkibalama
  • 02-03-2022
  • Business
contestada

what is changing risk​

Respuesta :

pompomsquad33 pompomsquad33
  • 02-03-2022

Answer:

here:

Explanation:

A change risk is the probability that a change program will not reach its stated objectives and goals. There is a wide range of factors that will increase the change risk for a project, and so it is important to conduct an effective risk change assessment to understand, document, and reduce these change risks.

Answer Link

Otras preguntas

what prize established in 1896 for promoting world peace
Earthquakes are a natural hazard of Mexico’s central plateau because of the region’s _____.
I have so many unanswered questions. Here is one that I am studying for. What is the difference between a ecosystem and a community?? ANSWER AS FAST AS POSSIBLE
Define the word ' asunder '
How many square feet of carpeting will be needed if the measurements are 19 and a half 31 and 7 eights 13 and three fifths 11 and three fourths three and three
Sand grains can be distinguished from silt grain by ____.
How can salvation be attained according to evangelicals?
Can some one solve this in long division
Please helps I suck at history Reducing the regulations on businesses was part of President Carter’s plan to A. Lower interest rates. B. Lower inflation. C. Rai
The function f is defined by f(x)=2x^2-4. Find f(-x)