agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

State two non-sexual methods one can contract HIV. Next, state two methods HIV cannot be transmitted.
Here are the average global temperatures for the contiguous United States over the last 30 years (measured in oF). use the table in the image below to answer th
A wire with a resistance of 10 ohm is stretched so that its new length is four times its original length. find the resistance of the longer wire, assuming that
Tina is making rectangular signs. Each poster has an area of 1800 square inches and the length is 30 inches more than the width. Find the length and width of he
what is the least of seven consecutive integers whose sum equals 168
The monomers of nucleic acids, such as dna and rna, are known as a. proteins. b. nucleotides. c. polypeptides. d. nuclei.
what is the radical of 63
What are good ways to protect your computer
The table below shows the x variable for a table. Choose a corresponding y table that will create a direct variation.
Simplify the expression. 11c + 3(-5c + 4d) a.-18c + 12d b.-4c + 4d c.-4c + 12d d.6c + 4d + 3